7,7 kWp On-Grid at BSD, Tangerang, Banten

7,7 kWp On-Grid at BSD, Tangerang, Banten
Category: Tangerang

Installation PLTS Industrial 7,7 kWp On-Grid at BSD, Tangerang, Banten

  • Location : Tangerang, Banten
  • Total Capacity : 7,7 kWp
  • System : On-Grid
  • Estimation Carbon Emission Reduction: 7.261 kg CO2/year
Previous