7,7 kWp Hybrid at Bogor, Jawa Barat

7,7 kWp Hybrid at Bogor, Jawa Barat
Category: Bogor

Installation PLTS Industrial 7,7 kWp Hybrid at Bogor, Jawa Barat

  • Location : Bogor, Jawa Barat
  • Total Capacity : 7,7 kWp
  • System : Hybrid
  • Estimation Carbon Emission Reduction: 7.261 kg CO2/year
Previous