6,6 kWp On-Grid at PT Artimas Bumi Asri Cipayung, Jakarta Timur

6,6 kWp On-Grid at PT Artimas Bumi Asri Cipayung, Jakarta Timur
Category: Jakarta

Installation PLTS Industrial 6,6 kWp On-Grid at PT Artimas Bumi Asri Cipayung, Jakarta Timur

  • Location : Cipayung, Jakarta Timur
  • Total Capacity : 6,6 kWp
  • System : On-Grid
  • Estimation Carbon Emission Reduction: 6.224 kg CO2/year
Previous