20,25 kWp Hybrid at Cipaku, Bogor, Jawa Barat

20,25 kWp Hybrid at Cipaku, Bogor, Jawa Barat
Category: Bogor

Installation PLTS Industrial 20,25 kWp Hybrid at Cipaku, Bogor, Jawa Barat

  • Location : Cipaku, Bogor, Jawa Barat
  • Total Capacity : 20,25 kWp
  • System : Hybrid
  • Estimation Carbon Emission Reduction: 19.096 kg CO2/year
Previous