2,2 kWp On-Grid at Tangerang

2,2 kWp On-Grid at Tangerang
Category: Tangerang

Installation PLTS Industrial 2,2 kWp On-Grid at Tangerang

  • Location : Tangerang
  • Total Capacity : 2,2 kWp
  • System : On-Grid
  • Estimation Carbon Emission Reduction: 2.075 kg CO2/year
Previous